800 VDC rack power shelf / power sidecar

800V直流供电电源架 / 电源边车 · Power

unrestrictedHS 8504.40per shelf / sidecarCN supply: moderate

What Qing asks

One dense message. Five is the whole budget per supplier reply, so the questions that decide comparability go first.

53
Decides comparability — a quote missing these cannot be ranked
  1. 1.

    电源框高度是几个 OU(ORv3为1OU,不是2U)?装几个模块、每个多少kW?最大输出、N+1 下输出、N+N(双路供电)下输出分别是多少kW?例如 6x3kW=18kW最大 / 15kW N+1 / 9kW N+N,或 6x5.5kW=33kW最大 / 27.5kW 5+1。输入是单whip还是双whip、7针通用输入吗、三相是星形还是三角形、电压范围?

    Shelf height in OU (ORv3 is 1OU, not 2U)? How many modules at what kW each? Maximum, N+1 and N+N (dual-feed) output in kW - e.g. 6x3kW = 18 kW max / 15 kW N+1 / 9 kW N+N, or 6x5.5kW = 33 kW max / 27.5 kW at 5+1. Single-whip or dual-whip input, 7-pin universal inlet, three-phase wye or delta, and voltage range?

    N+N halves usable power. A shelf quoted at its headline kW is quoted at zero redundancy.

  2. 2.

    母线额定是48V还是51V?在市电中断时电源保持能量耗尽后输出下降多少伏(参考设计为下降3V)触发BBU接管?母线电压高于44V持续0.1秒时是否判定为BBU放电中并进入0-5.5秒随机上电延时(无BBU时为0-2秒)?多台模块是否通过 SYNC_START / Do_SyncReady_L / DI_Sync_H 同步上电?从48V模式切回51V需要多久?

    Is the bus nominally 48 V or 51 V? On mains loss, by how many volts does the output fall after hold-up energy is spent, to hand over to the BBU (reference design drops 3 V)? Does bus voltage above 44 V for 0.1 s flag 'BBU discharging' and trigger the 0-5.5 s randomised turn-on window (0-2 s without BBU)? Do modules synchronise turn-on via SYNC_START / Do_SyncReady_L / DI_Sync_H? How long to move from 48 V mode back to 51 V?

    Get this wrong and the shelf and the BBU fight each other on restoration; it is the least documented, most failure-prone interface in ORv3.

  3. 3.

    报价是否包含 PMC(电源框管理控制器,含前面板以太网口和串口调试)和 PMI(Modbus 引出扩展模块)?上游通信协议是 Modbus 还是 PMBus,是否支持 Redfish?通信线束的针位定义(GND、PLS 电源/备电掉电信号、BKP、RS485 A/B)请一并提供。

    Does the quote include the PMC (Power Management Controller, front Ethernet plus serial console) and the PMI (Modbus bring-out extension module)? Is upstream comms Modbus or PMBus, and is Redfish supported? Send the comms cable pinout (GND, PLS power-loss signal, BKP, RS485 A/B).

    These are separate SKUs in the reference ORv3 system. Buyers discover this after the shelf lands.

  4. 4.

    该电源在满载时的掉电保持时间(hold-up time)是多少毫秒?在10%/20%/50%/100%负载下的实测效率分别是多少?请提供第三方测试报告或80 PLUS证书查询链接。

    What is the hold-up time in milliseconds at full load? Give measured efficiency at 10%, 20%, 50% and 100% load. Provide a third-party test report or the 80 PLUS certificate lookup link.

    Hold-up time decides whether a UPS transfer or a brief sag takes the server down. It is never volunteered, and cheap CRPS units cut it first. Efficiency must be quoted at 10/20/50/100% load, not as an 80 PLUS badge.

Asked on every purchase — commercial and compliance terms
  • 这批货是全新原封、官翻、拆机件还是工程样片(ES/QS)?请在形式发票上写明状态。如果是拆机件,来源和使用时长是多少?

  • 报价是EXW、FOB还是CIF?指定口岸是哪里?报价里不含哪些费用(出口报关、内陆运输、保险、目的港费用)?

  • 外箱尺寸多少?每箱装几台、毛重多少公斤?每托盘几箱?整单总体积多少立方米?是木托还是纸托、是否需要熏蒸证明?

  • 请给出阶梯报价:1台、10台、50台、100台各是什么价格?每个型号的起订量是多少?价格有效期多久?

  • 出口报关准备用哪个HS编码?报价是含税价还是不含税价?该编码的出口退税率是多少、退税是否已经体现在报价里?

  • 整机原产地写哪里?能否出具原产地证(一般CO还是Form E/RCEP优惠证)?货物是从中国直接出口,还是经香港、新加坡或越南转运?

  • 质保多少个月?DOA(到货即损)申报期限是几天?返修是寄回中国还是有海外备件?是否提供先行换货?返修运费谁承担?

  • 这个托架/导轨/面板是原厂件还是兼容件?上面有没有原厂LOGO或型号标识?能否书面保证不侵犯第三方商标和专利,并承担相关责任?

  • 整机和关键部件(CPU、加速卡、网卡)的原产地分别是哪里?产品里有没有使用美国原产的芯片、软件或技术?大概占多少比例?能不能配合签署最终用户和最终用途声明、承诺不转运?这个型号以前出口过哪些国家?

  • 合同和发票的签约主体全称是什么?统一社会信用代码是多少?工厂是自有还是代工?母公司或控股股东是谁、持股比例多少?有没有国资或上市公司背景?

  • 请提供公司全称、统一社会信用代码和营业执照复印件。贵司是生产工厂、原厂授权代理还是贸易商?如为工厂,工厂地址在哪里、可否安排验厂或视频验厂?开票主体与收款主体是否为同一家公司?

  • 最小起订量是多少?请给出阶梯报价(如100/500/1000/5000片)。报价有效期多少天?NAND和HDD价格波动时如何调价?是否接受锁价?

+ 37 more universal terms

How buyers get burned here

Category-specific, from research rather than generic advice

  • Cooling sized at 25 °C, not at your real ambient. Chinese vendors habitually publish nominal cooling capacity at benign conditions. A DX in-row unit rated 40 kW at 35 °C outdoor may deliver 26–30 kW at 48 °C in the Gulf, and its condenser may trip on high pressure entirely. Demand the capacity table at YOUR site design ambient (dry bulb and wet bulb, 0.4% ASHRAE annual percentile), and make the derated figure the contractual number.
  • 'IP55' that is IP55 only on the shell. Aipu-Waton's own literature confirms IP65 is a customisation, not a default. Louvres, cable entries, condenser openings and door seals are where ingress actually happens. In sandstorm or coastal environments specify the filtration class (G4/F7), the coating system (C5-M per ISO 12944 for marine), and require an ingress test report on the assembled unit, not a component certificate.
  • No UL 2755 certification for a North American destination. UL 2755:2025 is the Outline of Investigation that US and Canadian AHJs now reference for prefabricated modular data centre systems. Almost no Chinese factory holds it as standard, and obtaining it retrospectively means factory inspection plus rework. Ask for the certificate number and the certifying body (UL Solutions, Intertek or CSA) before, not after, the PO.
  • Component CE certificates presented as an assembly CE mark. There is no unitary CE mark for a modular data centre. What is required is a technical file combining LVD, EMC, Machinery Directive (for moving parts), pressure equipment (for the cooling circuit), and construction product evidence for the enclosure, plus a Declaration of Conformity naming the assembly. A folder of supplier CE certificates for the UPS and the AC unit is not that.
  • Standards mismatch that voids your local design code. GB 50174-2017 explicitly excludes outdoor container-based facilities from its scope. If a supplier cites GB 50174 compliance for a container product, they are citing the wrong standard — the applicable Chinese document is GB/T 36448-2018, with GB/T 1413 and GB/T 5338 for the box itself. Neither maps cleanly onto EN 50600 or the Uptime Institute Tier system, and a container is very hard to certify as Tier III concurrently maintainable.
  • Rated payload exceeded, silently. A 40HQ has a rated payload around 26–28 t. A fully fitted 40ft data centre with racks, UPS, batteries, transformer and a filled liquid loop routinely exceeds it. The unit then cannot be stowed as ordinary FCL, cannot be lifted by standard terminal equipment, and cannot legally travel on many roads. Get the weight certificate — dry, and wet-and-populated — in writing before booking freight.
  • Out-of-gauge cargo discovered after signing. Anything wider than 2438 mm or taller than 2896 mm is out-of-gauge: flat-rack or breakbulk stowage, special handling, route survey, escorts and permits. Huawei's FusionDC1000B core module at 3600 mm high is already in this category. On difficult inland routes the freight and permit cost can approach the module price. Establish the transport envelope before the technical spec is frozen.

Generated imagery — illustrative of the category, not a photograph of any supplier, facility or product on this platform.