BBU (battery backup unit) shelf for OCP-style racks

BBU 电池备份单元 / BBU 电池框 (机架式) · Power

PRC licenceHS 8507.60per shelfCN supply: strong

Requires a PRC dual-use export licence held by the supplier (两用物项出口管制条例, in force 2024-12-01).

What Qing asks

One dense message. Five is the whole budget per supplier reply, so the questions that decide comparability go first.

51
Decides comparability — a quote missing these cannot be ranked
  1. 1.

    请提供:UN38.3 测试报告及测试摘要、SDS/MSDS、锂电池空运鉴定书(航空运输鉴定报告)。运输 UN 编号是 UN3480(单独锂电池)还是 UN3481(含设备)?出货荷电状态(SoC)是否不超过30%?适用哪个包装说明(PI965/966/967)?UN规格外包装的编码是什么?我方倾向海运,请给出海运可行性与IMDG申报要求。

    Send: UN38.3 test report and test summary, SDS, and the air-transport assessment report. Is the shipping UN number UN3480 (cells/batteries alone) or UN3481 (with equipment)? Is shipping state of charge kept at or below 30%? Which packing instruction (PI965/966/967)? What is the UN-specification outer packaging code? We prefer sea freight - confirm feasibility and IMDG declaration requirements.

    This, not export control, is what strands a BBU order. Ask before you order, not at the forwarder.

Ranking inputs
  1. 2.

    你们是否同时提供锂电BBU框和电容储能框(Power Capacitor Shelf / 超容框)?请按相同机架给出对比:可支撑功率kW、支撑时间、循环寿命、充电恢复时间、工作温度范围、是否属于危险品运输、以及每kW成本。

    Do you offer both a lithium BBU shelf and a capacitor shelf (Power Capacitor Shelf)? Compare them for the same rack: supported kW, ride-through duration, cycle life, recharge time, operating temperature range, whether they ship as dangerous goods, and cost per kW.

Asked on every purchase — commercial and compliance terms
  • 这批货是全新原封、官翻、拆机件还是工程样片(ES/QS)?请在形式发票上写明状态。如果是拆机件,来源和使用时长是多少?

  • 报价是EXW、FOB还是CIF?指定口岸是哪里?报价里不含哪些费用(出口报关、内陆运输、保险、目的港费用)?

  • 外箱尺寸多少?每箱装几台、毛重多少公斤?每托盘几箱?整单总体积多少立方米?是木托还是纸托、是否需要熏蒸证明?

  • 请给出阶梯报价:1台、10台、50台、100台各是什么价格?每个型号的起订量是多少?价格有效期多久?

  • 出口报关准备用哪个HS编码?报价是含税价还是不含税价?该编码的出口退税率是多少、退税是否已经体现在报价里?

  • 整机原产地写哪里?能否出具原产地证(一般CO还是Form E/RCEP优惠证)?货物是从中国直接出口,还是经香港、新加坡或越南转运?

  • 质保多少个月?DOA(到货即损)申报期限是几天?返修是寄回中国还是有海外备件?是否提供先行换货?返修运费谁承担?

  • 这个托架/导轨/面板是原厂件还是兼容件?上面有没有原厂LOGO或型号标识?能否书面保证不侵犯第三方商标和专利,并承担相关责任?

  • 整机和关键部件(CPU、加速卡、网卡)的原产地分别是哪里?产品里有没有使用美国原产的芯片、软件或技术?大概占多少比例?能不能配合签署最终用户和最终用途声明、承诺不转运?这个型号以前出口过哪些国家?

  • 合同和发票的签约主体全称是什么?统一社会信用代码是多少?工厂是自有还是代工?母公司或控股股东是谁、持股比例多少?有没有国资或上市公司背景?

  • 请提供公司全称、统一社会信用代码和营业执照复印件。贵司是生产工厂、原厂授权代理还是贸易商?如为工厂,工厂地址在哪里、可否安排验厂或视频验厂?开票主体与收款主体是否为同一家公司?

  • 最小起订量是多少?请给出阶梯报价(如100/500/1000/5000片)。报价有效期多少天?NAND和HDD价格波动时如何调价?是否接受锁价?

+ 37 more universal terms

How buyers get burned here

Category-specific, from research rather than generic advice

  • kVA quoted where kW is meant. A 500 kVA UPS at 0.9 output power factor delivers 450 kW. Chinese modular UPS is now usually unity-PF, but older platforms and cheap bids are not, and the 10% gap is invisible until commissioning. Always demand both numbers and the output PF.
  • Battery quoted in ampere-hours. UPS batteries are sized in watts per cell at a specified end voltage for a specified time, because data centre autonomies are short and high-rate. An Ah figure tells you almost nothing about whether the string will hold the load for 10 minutes. A supplier who quotes only Ah either does not understand UPS duty or is hoping you do not.
  • Autonomy quoted at nameplate, not at end of life or at the real ambient. Ten minutes at a new battery at 25 C can be six or seven minutes at end of warranty in a 35 C battery room. Specify the sizing conditions in the RFQ.
  • Transformer losses that fail EU Ecodesign Tier 2. The standard Chinese SCB13 dry-type is a fine transformer that in many ratings simply cannot be legally placed on the EU market under Regulation (EU) 548/2014 as amended by 2019/1783. Buyers discover this after the letter of credit is open. Ask for guaranteed watt figures, not a class name, and check them against the regulation before ordering.
  • SF6 ring main units quoted into the EU. The F-gas Regulation (EU) 2024/573 restricts new SF6 MV switchgear placed on the EU market. A Chinese supplier's default RMU is SF6. The SF6-free alternative exists but Chinese depth in it is much thinner and the type-test evidence is often a family read-across rather than a test of the quoted model.
  • Genset emission tier assumed transferable. India's CPCB IV+ has applied to DG sets since July 2023 and disqualifies most Chinese-packaged engines outright. EU Stage V and US EPA Tier 4 are separate hurdles again. An engine certified for the Chinese domestic non-road standard is not installable in these markets, and no amount of documentation fixes it after shipment. This is the single most expensive mistake in the category.
  • Busway quoted without a common routing drawing. Straight lengths are the cheap, easy-to-compare part. Elbows, tees, offsets, expansion joints, fire barriers, end feeds and hangers frequently exceed the cost of the straights and vary enormously between bidders reading the same layout differently. Issue one routing drawing revision and require an itemised bill of fittings against it, or the tender is theatre.

Generated imagery — illustrative of the category, not a photograph of any supplier, facility or product on this platform.